Decarbonising industrial clusters is critical to achieving the UK’s net-zero industrial strategy. This study focuses on Teesside, an industrial cluster in Northeast England, analysing its transition through the framework of the Sociology of Expectations (SoE). The research investigates the role of public and private stakeholders in driving decarbonisation efforts, concentrating on a limited set of technologies and large-scale megaprojects, especially carbon capture, hydrogen production, CO2 and hydrogen transport. The study highlights the challenges of deploying these first-of-a-kind technologies, which are not yet commercially viable in the UK. Our analysis identifies both opportunities and significant risks in Teesside’s approach, particularly the potential over-reliance on a narrow range of technologies. The findings raise concerns about the assumed reductions in costs and carbon emissions, questioning the feasibility of scaling these technologies for long-term industrial sustainability. The main implication is that, should the technologies currently favoured by incumbent industry fail to perform, the expectations could play a double and contradictory role in net-zero transitions—by both motivating actors to legitimise decarbonisation technologies, yet blinding others to the significant challenges that lie ahead.

Herman, Kyle Stuart; Iskandarova, M.; Sovacool, B. K.. (2025). Imagining a net-zero Teesside: actors, networks, and expectations in industrial decarbonisation megaprojects. ENVIRONMENTAL RESEARCH COMMUNICATIONS, (ISSN: 2515-7620), 7:1, ---. Doi: 10.1088/2515-7620/ad8f99.

Imagining a net-zero Teesside: actors, networks, and expectations in industrial decarbonisation megaprojects

Herman K. S.;
2025

Abstract

Decarbonising industrial clusters is critical to achieving the UK’s net-zero industrial strategy. This study focuses on Teesside, an industrial cluster in Northeast England, analysing its transition through the framework of the Sociology of Expectations (SoE). The research investigates the role of public and private stakeholders in driving decarbonisation efforts, concentrating on a limited set of technologies and large-scale megaprojects, especially carbon capture, hydrogen production, CO2 and hydrogen transport. The study highlights the challenges of deploying these first-of-a-kind technologies, which are not yet commercially viable in the UK. Our analysis identifies both opportunities and significant risks in Teesside’s approach, particularly the potential over-reliance on a narrow range of technologies. The findings raise concerns about the assumed reductions in costs and carbon emissions, questioning the feasibility of scaling these technologies for long-term industrial sustainability. The main implication is that, should the technologies currently favoured by incumbent industry fail to perform, the expectations could play a double and contradictory role in net-zero transitions—by both motivating actors to legitimise decarbonisation technologies, yet blinding others to the significant challenges that lie ahead.
2025
actors and networks
blue hydrogen
carbon capture and storage
industrial decarbonisation
sociology of expectations
Herman, Kyle Stuart; Iskandarova, M.; Sovacool, B. K.. (2025). Imagining a net-zero Teesside: actors, networks, and expectations in industrial decarbonisation megaprojects. ENVIRONMENTAL RESEARCH COMMUNICATIONS, (ISSN: 2515-7620), 7:1, ---. Doi: 10.1088/2515-7620/ad8f99.
File in questo prodotto:
File Dimensione Formato  
Herman_etal_2025a.pdf

Open Access

Descrizione: Net Zero Teesside
Tipologia: Versione dell'editore
Licenza: Creative commons
Dimensione 1.29 MB
Formato Adobe PDF
1.29 MB Adobe PDF Visualizza/Apri
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11385/264298
Citazioni
  • Scopus 13
  • ???jsp.display-item.citation.isi??? 11
  • OpenAlex 14
social impact