Costly auditing with non-contractible investment. Timing of verification, commitment, and loan size.

Essays on Optimal Contracts with Costly State Verification / Crescenzi, Michele. - (2013 Jun 10).

Essays on Optimal Contracts with Costly State Verification

2013

Abstract

Costly auditing with non-contractible investment. Timing of verification, commitment, and loan size.
10-giu-2013
Costly State Verification. Limited Commitment.
Essays on Optimal Contracts with Costly State Verification / Crescenzi, Michele. - (2013 Jun 10).
File in questo prodotto:
File Dimensione Formato  
20130610-crescenzi-summary-eng.pdf

Open Access

Tipologia: Abstract
Licenza: Non specificato
Dimensione 64.62 kB
Formato Adobe PDF
64.62 kB Adobe PDF Visualizza/Apri
20130610-crescenzi.pdf

Open Access

Tipologia: Tesi di dottorato
Licenza: Non specificato
Dimensione 250.06 kB
Formato Adobe PDF
250.06 kB Adobe PDF Visualizza/Apri
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11385/201042
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact